# FDOT (Florida DOT) — Congestion Mitigation and Air Quality (CMAQ)

CMAQ funds projects that reduce congestion and improve air quality in nonattainment/maintenance areas. Includes transit, EV charging, idle reduction, and travel demand management. Contact FDOT (Florida DOT) for current solicitation schedule and application requirements.

Canonical page: https://grantsonar.com/grants/opportunity/fdot-florida-dot-congestion-mitigation-and-air-quality-cmaq-59a4238b-a255-48a7-8272-1fc96ab443b0
Source: dot_fl
Source ID: fl_dot_cmaq
Last confirmed Aug 29, 2026 · Florida DOT
Deadline: not listed
Award size: $200K to $5.0M

## Answer-first Q&A

### Who is eligible for FDOT (Florida DOT) — Congestion Mitigation and Air Quality (CMAQ)?

FDOT (Florida DOT) — Congestion Mitigation and Air Quality (CMAQ) eligibility includes sled, nonprofit and for_profit. Geographic eligibility is FL; applicants should confirm the source notice before applying.

### What is the deadline for FDOT (Florida DOT) — Congestion Mitigation and Air Quality (CMAQ)?

FDOT (Florida DOT) — Congestion Mitigation and Air Quality (CMAQ) has a listed deadline of not listed. Grant deadlines can change, so verify the current date with FDOT (Florida DOT) before submitting.

### How much funding is available for FDOT (Florida DOT) — Congestion Mitigation and Air Quality (CMAQ)?

FDOT (Florida DOT) — Congestion Mitigation and Air Quality (CMAQ) lists an award size of $200K to $5.0M. Award ranges and total program funding are reported from the source metadata when available.

### Who funds FDOT (Florida DOT) — Congestion Mitigation and Air Quality (CMAQ)?

FDOT (Florida DOT) — Congestion Mitigation and Air Quality (CMAQ) is funded by FDOT (Florida DOT). GrantSonar tracks the notice with source ID fl_dot_cmaq from dot_fl.

